Product
Operation types
Pricing
Compare
Resources
Log in See a 15-minute demo ESEN
Guide · 7 min

The first thirty days with the new system in the hotel restaurant: what to measure each week

The day of the switch is not what determines whether the new system worked. It is the month that follows. Here is what to check week by week in your hotel restaurant to reach the first monthly report with confidence.

You switched systems in your hotel restaurant and the first service went well. That is a good sign, but it is not the real test. The real test is the following month: if at day thirty the report closes clean, you made the right call. If not, you are still in time to correct course without having lost an entire quarter.

Why the first month is different from every other one

During the first month with a new system, two things happen at once: the team is learning a different workflow, and you are trying to decide whether that workflow is correct. If you wait until month-end to review everything together, you will find thirty days of accumulated errors with no way to know which week they started in or why. The solution is to measure by week, not by month, and compare each week against the previous one.

This does not mean distrusting the new system. It means treating the implementation (implementacion) for what it is: a process with stages, not a switch that flips on and is done. Each week has a different question to answer.

Week one: the close balances every day

The first week is not about optimizing anything. It is about making sure the shift close (A guide to the shift close by revenue center in a hotel) balances every single day, even if it takes longer than it did with the old system. If the close does not balance on day one, the cause has to be found that same day, not left alone assuming “it will sort itself out”.

  • Check each shift’s close against cash and terminals, not only the full-day close.
  • Log any difference, however small, with the time and revenue center where it happened.
  • Ask the team which part of the flow felt confusing, even if the close balanced.
  • Do not close the day without someone from IT or the provider confirming that day’s configuration was correct.

The sign that week one went well

It is not that there were no mistakes. It is that each mistake was identified the same day and did not repeat the next day. A new mistake every day is normal learning. The same mistake repeated three days in a row is a sign that training is missing or something in the configuration is wrong.

Week two: the room charge reaches the front desk complete

The second week focuses on one critical point: the room charge (Room charge). It is the flow that frustrates a guest the most when it fails, because it fails at check-out, when they are already in a hurry to leave. Verify that every charge captured in the restaurant reaches the guest’s folio at the front desk complete, with the correct room number and the correct amount.

  1. Ask the front desk to report any charge that arrives incomplete, duplicated, or missing from the folio.
  2. Compare the restaurant’s total room charges against what shows up in the front desk system every night.
  3. Verify that the system confirms the active stay before accepting the charge, not only the room number.
  4. If you find a missing charge, trace which step of the flow lost it before assuming it was human error.

If by the end of week two the charges arrive complete and without discrepancies, you have solved the point that causes the most friction between the restaurant and the front desk. If losses are still happening, this is priority number one before moving on to anything else.

Use this week to sit the restaurant manager and the front desk supervisor at the same table, even if only for fifteen minutes. Often the problem is not the system, it is that the two areas describe the same symptom differently and nobody has compared the two versions side by side. A short weekly meeting during the first month saves several urgent calls in the middle of a service.

Week three: permissions match the real roles

By the third week, the team already knows the system well enough that it is time to adjust permissions with judgment, not out of opening-day urgency. In the first week it is common to give everyone broad permissions so as not to slow down service. By the third week you already know who actually needs what.

  • Check who can apply discounts and confirm only the right roles have that permission.
  • Check who can void a check that is already closed, which should be a very small group.
  • Confirm every person has their own user and PIN, with no shared access left over from the transition.
  • Adjust the controller’s permissions so they can see every revenue center, not only the main restaurant.

The common mistake this week

The most common mistake is leaving the broad first-week permissions in place “because they already work that way” and postponing the adjustment indefinitely. Every week that goes by without adjusting permissions is another week where a wrong discount or an improper void can slip by unnoticed.

Week four: preparing the first comparable monthly report

The fourth week is not about operating, it is about building the report you will present at the first meeting with the new system. That report has to be comparable with the previous month, even if the previous month ran on the old system, because the meeting will ask “did we improve or get worse?” and you need an answer with numbers.

MetricWhere to check it
F&B revenue per occupied roomReports (/reportes), cross-checked against front desk occupancy
Room charges completed vs. lostRestaurant compared against the front desk folio
Shift close discrepancies per weekClose history by revenue center
Discounts and voids per personSales report filtered by user
The four minimum metrics for the first comparable monthly report in the hotel restaurant.

If any of these four metrics cannot be pulled with clean data by month-end, that is a sign that work is still needed in the configuration, not the operation. It is better to say so at the meeting than to present a number you know is incomplete.

An illustrative example of week-by-week progress

The figures below are made up to show the calculation; they do not correspond to any real property.

WeekClose discrepancies foundRoom charges lost
Week 153
Week 221
Week 310
Week 400
Illustrative example of the expected stabilization curve during the first month.

In the example, if by week four the close discrepancies and lost room charges have not dropped to zero or very close to it, do not wait for the following month to act. The curve should trend downward every week; if it stalls or rises, there is a specific cause you need to find before moving forward.

When to ask the provider for help

Not everything gets solved internally, and it should not. If by week two the room charge is still failing, or by week three permissions cannot be configured the way the hotel needs, it is time to escalate with the provider instead of continuing to try by trial and error. Good implementation support (implementacion) expects those calls during the first month; it is not a sign something went wrong, it is a normal part of the process.

In short

The first month with the new system is measured week by week, not at the end. Week one: the close balances. Week two: the room charge arrives complete. Week three: permissions match the real roles. Week four: the first comparable monthly report.

What to do this week

  1. Identify which week of the first month your restaurant is in and go through that week’s checklist.
  2. If all four weeks have passed and some metric still has no clean data, treat it as a priority before moving forward.
  3. Book a call with the provider if the room charge or permissions have not been resolved by the relevant week.
  4. Build the comparable report for the four metrics even if the previous month has gaps, and document those gaps.
  5. Share the week-by-week discrepancy curve with the team so they see the progress, not only the mistakes.

Inn Restaurant supports every hotel’s first month with weekly reviews of the close, the room charge, and permissions, to reach the first monthly report with no surprises. If you are about to switch systems or already did and want a second review, book a 15-minute demo at (contact).

Your hotel’s restaurant already sells well. Now the hotel needs to know it.

Fifteen minutes, with your menu and your tables. Nothing to install.

See a 15-minute demo
We use the minimum to make the site work and to know which pages are useful. You can reject the rest.